Eastern State Hospital, FSU Security System Improvements

DESCRIPTION: This project started as a study to provide options for the replacement of the existing low voltage security electronics systems within the Forensic Services Unit of the Eastlake Building. The study and report identified current available technologies, and provided a cost implementation plan to develop the project for funding in the next biennium State funding cycle.

After funding was secured, design documents were prepared, and construction administration services provided for remodeling of the existing systems to provide new low voltage security electronics systems, including the following:

  • Door control systems.
  • CCTV systems.
  • Intercom and Paging systems.
  • Access control systems.
  • Network infrastructure.
  • UPS Systems.

LOCATION: Medical Lake, Washington
FACILITY SIZE: 76,700 Square Feet, 105 Beds
CLIENT: Washington State DSHS
DELIVERY METHOD: Design-Bid-Build
ARCHITECT: NAC|Architecture – Spokane, Washington
SECURITY ELECTRONICS CONTRACTOR: Engineered Control Systems/Cornerstone Detention – Spokane, Washington
SERVICES PROVIDED: Electrical and Security Electronics System Design