Bonner General Health EES Replacement

Bonner General Health EES Replacement

DESCRIPTION: PCI provided design and construction administration services for the replacement of the Essential Electrical System (EES) in this occupied 25 bed Critical Access Hospital.

The electrical design consisted of a new generator, generator pad, transformers, automatic transfer switches, uninterruptible power supplies, electrical switchboards, distribution panels, and branch circuit panels.

Additionally, the facility’s CT Scan imaging equipment was added to the EES system to enhance reliability of this equipment.

PCI served as the Prime Consultant on this project.

LOCATION: Sandpoint, Idaho
CLIENT: Bonner General Health – Sandpoint, Idaho
DELIVERY METHOD: Design-Bid-Build (DBB)
CONTRACTOR: Bouten Construction – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Santa Barbara County North Branch Jail

Santa Barbara County North Branch Jail

DESCRIPTION: PCI provided Construction Administration for the security electronics systems on this 138,000 square foot, 376 bed jail, of which 32 beds are dedicated to medical and mental health in a specialized housing unit. Services included modifications of the design documents (original documents were by others), field site inspections, punchlist reports, and testing of the security electronics systems.

LOCATION: Santa Maria, California
CLIENT: Santa Barbara County Sheriff’s Office – Santa Barbara, California
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: Kitchell CEM – Sacramento, California
SERVICES PROVIDED: Security Electronics Construction Administration, Security Electronics Commissioning

Pictures courtesy of Kitchell

Butte County Jail

Butte County Jail

DESCRIPTION: The County received SB863 funds to construct a new facility adjacent to the existing Butte County Jail. The project will consist of the design and construction of new adult detention housing units to accommodate 96 inmate beds, a new medical/mental health unit to accommodate 38 inmate beds, as well as housing units to include small and large group programming space. The new jail facility will be approximately 45,900 square feet of building space on a ~4.62 acre site, located just north of the main jail. Low voltage security electronics system design consists of a touchscreen/PLC based door control, closed circuit television (CCTV), digital intercom and paging, access control, and uninterruptible power supply systems. The access control and CCTV system are integrated with the existing campus systems for continuity between facilities.

LOCATION: Oroville, California
CLIENT: Butte County Sheriff’s Office – Oroville, California
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT:
Lionakis – Sacramento, California
SERVICES PROVIDED: Security Electronics System Design

Tsé Bit’a’í Justice Center

Tsé Bit’a’í Justice Center

DESCRIPTION: PCI is designing the Low Voltage Security Electronics systems for a new 80-bed 97,000 square foot facility which will provide Courts, Law Enforcement and Corrections services for the Navajo Nation within two buildings on the campus. The driving force behind the design is restorative justice that embraces culture, local context and the community as a whole.

LOCATION: Shiprock, New Mexico
CLIENT: Navajo Nation
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: KUBL
SERVICES PROVIDED: Low Voltage Security Electronics System Design

Tehama County Jail

Tehama County Jail

DESCRIPTION: The County received SB863 funds to construct a new facility adjacent to the existing Tehama County Jail. The project will consist of the design and construction of new adult detention housing units to accommodate 64 inmate beds. The new jail facility will be approximately 22,000 square feet of building space, located just west of the main jail. Low voltage security electronics system design consists of a touchscreen/PLC based door control, closed circuit television (CCTV), digital intercom and paging, access control, and uninterruptible power supply systems. The access control and CCTV system are integrated with the existing campus systems for continuity between facilities.

LOCATION: Red Bluff, California
CLIENT: Tehama County Sheriff’s Office – Oroville, California
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: Lionakis – Sacramento, California
SERVICES PROVIDED: Security Electronics System Design

Grand Mesa Youth Services Center

Grand Mesa Youth Services Center

DESCRIPTION: As part of a facility refurbishment for safety, risk mitigation, and modernization, this project facilitates the modernization of the existing juvenile facility by designing and installing multiple new electronic systems including a new PLC based door control system with new HMI station, intercom system, paging system, and CCTV system. PCI provided low voltage security electronics (LVSE) design services for this facility.

LOCATION: Grand Mesa, Colorado
CLIENT: Colorado Department of Human Services
DELIVERY METHOD: Design-Build (DB)
ARCHITECT: Reilly Johnson Architecture – Denver, Colorado
SERVICES PROVIDED: Security Electronics System Design

Providence Holy Family Hospital Critical Switchboard Replacement

Providence Holy Family Hospital Critical Switchboard Replacement

DESCRIPTION: PCI had recently completed a master planning project to prioritize replacement of normal and emergency power infrastructure at the hospital.

This project was an emergency project that resulted from the failure of a critical automatic transfer switch (ATS) serving the entire hospital including the acute care portion, of which, this was one of the items identified in the study.

The existing 1960’s era critical switchboard and ATS were close to failure and needed to be replaced as this equipment served the acute care hospital. Additionally, the hospital was cited for non-compliance as numerous normal power loads were intermixed with the critical branch. PCI designed new Normal, Critical, Equipment, and Optional Standby switchboards, associated automatic transfer switches, and redesigned the existing generator switchboard for code compliance.

LOCATION: Spokane, Washington
CLIENT: Holy Family Hospital – Spokane, Washington
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: Power City Electric – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Douglas County Law and Justice Facility

Douglas County Law and Justice Facility

DESCRIPTION: The third phase of a three phase project on the County campus, the new 18,000 square foot Law & Justice Facility supports the District Courts, Sheriff’s Offices, and provides support for other County Departments. PCI provided electrical design for the facility and design for interface to other campus electrical systems.

KEY FEATURES: District Courts, Sheriff’s Offices

LOCATION: Wenatchee, Washington
CLIENT: Douglas County – Wenatchee, Washington
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: MJ Neal Associates – Wenatchee, Washington
SERVICES PROVIDED: Electrical System Design

Ag Energy Integrated Biomass Platform

Ag Energy Integrated Biomass Platform

DESCRIPTION:This highly innovative project for Ag Energy included the design of the electrical and generation system for a containerized, portable biomass energy system designed for the agricultural industry. The Renewable Electricity System (RES), combines proven gasifier and generator technologies with modern automation and control systems to produce a mobile, autonomous power generation plant.

This system produces de-centralized power utilizing waste organic matter from high yield farming operations to produce sustainable energy. The RES system reduces energy use and operational costs, while producing renewable power, and effectively solving the farmer’s field residue surplus problem by converting the field residue waste stream into a valuable commodity.

LOCATION: Spokane, Washington
CLIENT: Ag Energy – Spokane, Washington
DELIVERY METHOD: Design-Build (DB)
SERVICES PROVIDED: Electrical Engineering Design

Kettle Falls Solar PV

Kettle Falls Solar PV

DESCRIPTION: This project was a design/build effort for a 100.8 kW-DC fixed ground mount solar PV array for the City of Kettle Falls at their WWTP site. The system is comprised of 336 Itek Energy 300 Watt modules. Power is converted by 4 SMA America 24000TL inverters and is connected to the Avista grid at 480 volts, 3 phase. The system offsets their utility usage by 132,000 kWh saving the City almost $14,000 per year.

LOCATION: Kettle Falls, Washington
CLIENT: City of Kettle Falls
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: Apollo Solutions Group – Kennewick, Washington
PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Santa Cruz County Rountree Detention and ReEntry Facility

Santa Cruz County Rountree Detention and ReEntry Facility

DESCRIPTION: The project includes developing bridging documents, work plans, system layout, and preliminary design documents for renovation and expansion of the existing Rountree Medium Security Facility to be used for the expansion of 64 additional beds, new program space, new perimeter fencing systems, and new intake and sallyports on the existing jail campus.

Now known as the Rountree Detention and Reentry Facility, the new and improved detention center combines education, vocational training, and rehabilitation services under one roof, with semi-private living areas for inmates and increased access to a variety of social and rehabilitative services.

Documents were provided for the following systems: movement door control systems; campus CCTV system; campus digital intercom and paging systems; data/telephone infrastructure; inmate telephone systems; video visitation systems; audio-visual systems; perimeter fence detection systems, and fire alarm systems.

LOCATION: Watsonville, California
PROJECT SIZE: 41,926 Square Feet
CLIENT: County of Santa Cruz
DELIVERY METHOD: Design-Build (DB)
ARCHITECT: CGL Companies – Sacramento, California
SERVICES PROVIDED: Low Voltage and Security Electronics Design

Humboldt County Re-Entry Facility

Humboldt County Re-Entry Facility

DESCRIPTION: The County received SB863 funds to construct a new re-entry facility adjacent to the existing Humboldt County Correctional Facility. This project provides a new, stand-alone 31,500 square foot, 44 bed adult reentry and mental health facility. Low voltage security electronics system design consists of a touchscreen/PLC based door control, closed circuit television (CCTV), digital intercom and paging, access control, and uninterruptible power supply systems. The access control and CCTV system are integrated with the existing campus systems for continuity between facilities.

LOCATION: Eureka, California
CLIENT: Humboldt County Sheriff’s Office – Eureka, California
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT:
Nichols, Melburg & Rosetto – Redding, California
Lionakis – Sacramento, California
SERVICES PROVIDED: Security Electronics System Design

Toppenish Solar PV

Toppenish Solar PV

DESCRIPTION: This project was a design/build effort for a 100.8 kW-DC fixed ground mount solar PV array for the Toppenish School District at their High School. The system is comprised of 336 Itek Energy 300 Watt modules. Power is converted by 4 SMA America 24000TL inverters and is connected to the Pacific Power grid at 480 volts, 3 phase. The system offsets their utility usage by 154,000 kWh saving the City almost $16,000 per year. The system will be used for the Science, Technology, Engineering and Mathematics (STEM) program to teach students about renewable and solar photovoltaic energy.

LOCATION: Toppenish, Washington
CLIENT: Toppenish School District
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: Apollo Solutions Group – Kennewick, Washington
PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Benton City Solar PV

Benton City Solar PV

DESCRIPTION: This project was a design/build effort for a 75.6 kW-DC fixed ground mount solar PV array for Benton City at their WWTP site. The system is comprised of 252 Itek Energy 300 Watt modules. Power is converted by 3 SMA America 24000TL inverters and is connected to the Benton City PUD grid at 480 volts, 3 phase. The system offsets their utility usage by 112,000 kWh saving the City almost $12,000 per year.

LOCATION: Benton City, Washington
CLIENT: Benton City
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR:  Apollo Solutions Group – Kennewick, Washington
PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

 

City of St. John Solar PV

City of St. John Solar PV

DESCRIPTION: This project was a design/build effort for a 100.8 kW-DC fixed ground mount solar PV array for the City of St. John on City owned property. The system is comprised of 336 Itek Energy 300 Watt modules. Power is converted by 4 SMA America 24000TL inverters and is connected to the Avista grid at 480 volts, 3 phase. The system offsets their utility usage by 143,000 kWh saving the City almost $15,000 per year.

LOCATION: St. John, Washington
CLIENT: City of St. John
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR: Apollo Solutions Group – Kennewick, Washington
Harrison Electric – Colfax, Washington
SERVICES PROVIDED: Electrical System Design

Idaho State Correctional Institute Buildings 15/16

Idaho State Correctional Institute Buildings 15/16

DESCRIPTION: This project was a design build retrofit of two buildings in an existing facility. The general scope of the project was replacement of several antiquated hard wired control panel systems with new touchscreen/HMI and PLC systems. Included in this project were new touchscreen control stations, new PLC control panels and integration to the existing door systems, new intercom headend equipment, and lighting control integration.

LOCATION: Kuna, Idaho
CLIENT: CTG Security Electronics – Spokane Valley, Washington
SERVICES PROVIDED: Security Electronic System Design

Global Credit Union

Global Credit Union

DESCRIPTION: Global Credit Union grew beyond the capacity of their existing headquarters building and bought an existing commercial building for remodel. This project consisted of remodel of that building for use by Global. Project design and construction was phased to minimize impacts on the existing building tenants and Global banking operations.

LOCATION: Spokane, Washington
FACILITY SIZE: 50,000 square feet
CLIENT: Global Credit Union – Spokane, Washington
DELIVERY METHOD: Design-Build (DB)
ARCHITECTS: Wolfe Architectural Group – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Cochrane Office Building

Cochrane Office Building

DESCRIPTION: Design included electrical systems of a new three story commercial facility for a local insurance brokerage. The building was situated on the foothills overlooking the city and design elements emphasized the natural view.

Electrical Systems Design included the following systems: Site Electrical Design; Normal Power Systems; Emergency Power for Building Data Systems; Interior Lighting and Control Systems; Exterior Lighting and Control Systems and Data/Telephone Infrastructure Wiring.

LOCATION: Spokane, Washington
CLIENT: Cochrane & Company – Spokane, Washington
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT: Denny Christiansen Architects – Spokane, Washington
SERVICES PROVIDED: Electrical System Design

Broomfield Police Department Security Replacement

Broomfield Police Department Security Replacement

DESCRIPTION: This project consists of the replacement of the security electronics system for the City/County of Broomfield Police Department, Public Safety Communications Center, and Courts Facility.

Security electronics system replacements include access control, programmable logic door control, vehicle sallyport control, touchscreen GUI, CCTV, intercom and paging, fixed duress alarm, and wireless personal duress alarm systems.

LOCATION: Broomfield, Colorado
FACILITY SIZE: 81,000 Square Feet
CLIENT: Broomfield Police Department
DELIVERY METHOD: Design-Bid-Build (DBB)
SERVICES PROVIDED: Security Electronics Design

Shasta County Adult Rehabilitation Center

Shasta County Adult Rehabilitation Center

DESCRIPTION: This project provides a new, stand-alone 33,000 square foot, 112 bed adult rehabilitation center. Low voltage security electronics system design consists of a touchscreen/PLC based door control, closed circuit television (CCTV), digital intercom and paging, access control, and uninterruptible power supply systems. The access control and CCTV system are integrated with the existing campus systems for continuity between facilities.

LOCATION: Redding, California
CLIENT: Shasta County Sheriff
FACILITY SIZE: 33,000 Square Feet, 133 Beds
DELIVERY METHOD: Design-Bid-Build (DBB)
ARCHITECT:
Nichols, Melburg, Rosetto Archiects – Redding, California
Lionakis – Sacramento, California
SERVICES PROVIDED: Security Electronic System Design

City of Colville Solar PV

City of Colville Solar PV

DESCRIPTION: This design/build project provided a 99.36kw PV system for the City of Colville. PCI and its subsidiary company, PCI Renewable, Inc., guidance was instrumental in securing additional funding for the project, which included a Washington State grant, and production incentives offered through Avista.

The system is comprised of two hundred eighty eight (288) US made SolarWorld SW345-XL modules, 48 of each per tracker. Each of the six arrays track the sun independently in order to maximize production. Power is converted by 12 Itek Energy PVI-7600 Inverters and the system is connected at 480 volts, 3-Phase. At the time of commissioning, the system was the largest of its kind in Washington State.

The system is guaranteed to produce 144,435 Kwh per year, which equates to cost reduction of $13,374 at the current utility rate. Real time and historical production may also be viewed over the web.

LOCATION: Colville, Washington
CLIENT: City of Colville
DELIVERY METHOD: Design-Build (DB)
CONTRACTOR:
Apollo Solutions Group – Spokane, Washington
PCI Renewables – Spokane, Washington
SERVICES PROVIDED: Electrical System Design